Skip to content

For hotels

The whole hotel, one purchase order.

Hotel Furniture Supplier — FF&E on One Purchase Order

Casegoods, fixed joinery, upholstered seating and millwork are manufactured under one roof in Gemlik. Soft furnishings, lighting, flooring, wet areas and the MEP inside the room are carried on the same contract and executed by trades we manage. One contract covers the room from CNC to punch-list closure.

What the program covers

Guestroom casegoods

Bed surrounds, wardrobes, desks, minibar units and vanities, engineered as room sets, labelled by room number, delivered install-ready.

Public areas & millwork

Reception desks, wall paneling, doors, restaurant and lobby furniture: architectural joinery from the same factory as your casegoods.

Upholstery & fabrics

Frames, foam and fabric sewn in-house; we supply fabrics and provide furniture R&D support to your architects, as on Marriott Belgrade.

Soft furnishings & lighting

Curtains, carpets and decorative lighting specified and supplied within the same package, as delivered at Moonlight Jeddah: one schedule covers the whole room.

Installation

We manage installation on site, to our own drawings, wherever the project is. Responsibility ends at the finished room, not at the container door.

How a program runs

The same sequence every time: the room is approved before the order is built, and every stage is scheduled back from the opening date.

01Brief & feasibility02Design & costing03Prototype room in Gemlikthe contractual benchmark04Series productionone roof, one schedule05Logistics & installation06Snag list & handoversign-off releases production
  1. 01

    Brief & feasibility

    Room mix, BOQ or early concept in; feasibility, a budget corridor and a current lead-time estimate back.

  2. 02

    Design & costing

    Shop drawings, material sampling and value engineering against the brand book.

  3. 03

    Prototype room in Gemlik

    We build your room before we build your order. Approvals are minuted; the approved room becomes the contractual benchmark.

  4. 04

    Series production

    CNC machining, veneer and lacquer finishing, upholstery and more, on one roof and one schedule.

  5. 05

    Logistics & installation

    Sequenced containers labelled by room number; installation managed by us on site.

  6. 06

    Snag list & handover

    Punch items closed before handover. After-sales comes from the factory that built the rooms.

Brand standards

We have manufactured to Marriott, Hilton, Mövenpick, Rotana and Ascott standards. We start at the mock-up room: you approve it, we release production, and the approved room becomes the contractual benchmark for everything built after it. Control samples for finish, fabric and hardware are signed off physically before that — the same gate we passed for Marriott Belgrade. We would rather cut a second sample than argue about whether the first was close enough. Eight model rooms in our showroom.

See the model rooms

From Gemlik to your site

30 min
factory to Gemlik port
Ex-Gemlik
road freight into the EU & Balkans
A.TR
customs-union document — duty-free EU entry
Room-by-room
sequenced, install-ready container loading

Hotel programs, delivered

Reference

Send the BOQ. Get a factory-direct number.

Drawings, room mix, or an early concept. We reply within 24 working hours, in English or Arabic.