For hotels
The whole hotel, one purchase order.

Casegoods, fixed joinery, upholstered seating, millwork and installation, manufactured under one roof in Gemlik and delivered as one sequenced program. One contract covers the room from CNC to punch-list closure.
What the program covers
Guestroom casegoods
Bed surrounds, wardrobes, desks, minibar units and vanities, engineered as room sets, labelled by room number, delivered install-ready.
Public areas & millwork
Reception desks, wall paneling, doors, restaurant and lobby furniture: architectural joinery from the same factory as your casegoods.
Upholstery & fabrics
Frames, foam and fabric sewn in-house; we supply fabrics and provide furniture R&D support to your architects, as on Marriott Belgrade.
Soft furnishings & lighting
Curtains, carpets and decorative lighting specified and supplied within the same package, as delivered at Moonlight Jeddah: one schedule covers the whole room.
Installation
We manage installation on site, to our own drawings. Responsibility ends at the finished room, not at the container door.
How a program runs
The same sequence every time: the room is approved before the order is built, and every stage is scheduled back from the opening date.
Brief & feasibility
Room mix, BOQ or early concept in; feasibility, a budget corridor and a current lead-time estimate back.
Design & costing
Shop drawings, material sampling and value engineering against the brand book.
Prototype room in Gemlik
We build your room before we build your order. Approvals are minuted; the approved room becomes the contractual benchmark.
Series production
CNC machining, veneer and lacquer finishing, upholstery, on one roof and one schedule.
Logistics & installation
Sequenced containers labelled by room number; installation managed by us on site.
Snag list & handover
Punch items closed before handover. After-sales comes from the factory that built the rooms.
Brand standards
We have manufactured to Marriott, Hilton, Mövenpick, Rotana and Ascott standards. We start at the mock-up room: you approve it, we release production. Eight model rooms stand permanently built in our showroom.
See the model roomsFrom Gemlik to your site
- 30 min
- factory to Gemlik port
- Ex-Gemlik
- road freight into the EU & Balkans
- A.TR
- customs-union document — duty-free EU entry
- Room-by-room
- sequenced, install-ready container loading
Hotel programs, delivered
Send the BOQ. Get a factory-direct number.
Drawings, room mix, or an early concept. We reply within 24 working hours, in English or Arabic.


